- About
- Related Products
- Description
- Specifications
- Features
- Downloads
- Shipping
Images are for illustration only and may not reflect the actual product. Refer to the description or specs.
Code: 45190
Schneider Electric XB5EVM3 Harmony 22 mm Round Green Dark gray plastic Pilot Light Illuminated 230-240 V AC Monolithic Complete Assembly
Normally In Stock
Schneider Electric XB5EVM3 Harmony 22 mm Round Green Dark gray plastic Pilot Light that is Illuminated . Uses 230-240 V AC and is a Monolithic Complete Assembly and has Screw Clamp Terminals and is IP 69 rated and UL 508 certified.
Condition: New
CALL FOR LEAD TIME*NON-CANCELLABLE, NON-RETURNABLE*
$28.56
Sale Price
$23.80
Tariff Status
Tariff may apply if shipping to the United States. Tariff costs are calculated and will be displayed in the shopping cart.
Need a large quantity or a custom solution?
Add this product to your job, favorites list or request a quick quote for volume pricing and lead time information. Our team is ready to assist with any special requirements.
Related Products
Description
Schneider Electric XB5EVM3 Harmony 22 mm Round Green Dark gray plastic Illuminated Pilot Light Monolithic Complete Assembly is made of high quality materials and is designed to be simple and flexible with Screw Clamp Terminals and a Steady signal. Uses 230-240 V AC and is IP 69 and UL 508 rated.
Specifications
(Switching-Indication) Color
White
(Switching-Indication) NEMA Rating
NEMA 13
(Switching-Indication) Size
22 mm
(Switching-Indication) Shape
Round
(Switching-Indication) Composition
Plastic
(Switching-Indication) Contacts Connection Type
Screw Clamp Terminals
(Switching-Indication) UL Rating
UL 508
(Switching-Indication) Illumination
Illuminated
(Switching-Indication) Signal Type
Steady
(Switching-Indication) NEMA Rating
NEMA 4X
(Switching-Indication) IP Rating
IP 69
(Switching-Indication) Current Consumption
14 mAmp
Manufacturer
Schneider Electric
Sub Component
Pilot Light
Features
Compatible with universal LED block to be used for all colors
Improved color intensity and brightness
Quick and easy assembly and disassembly
Downloads

Code: 45190
Schneider Electric XB5EVM3 Harmony 22 mm Round Green Dark gray plastic Pilot Light Illuminated 230-240 V AC Monolithic Complete Assembly
$28.56
Sale Price
$23.80








